Tips and tricks on how you can quickly and easily install your laminate floor from Krono Original®

Please first read through the entire installation guide for your new laminate floors. Follow these instructions exactly in order to maintain the full warranty and guarantee claims. Check the laminate panels carefully for damage before you begin. Once panels have been handled, they will no longer be covered under damage claims.

Before installation

  • Leave cartons of laminate flooring in the same climatic conditions as the room they are going to be installed in for at least 48 hours.
  • An important precondition for the installation and conservation of value of the laminate floors is a room temperature of approximately 20 degrees Celsius and a relative humidity of 50 to 70 per cent.
  • The subfloor must be absolutely even, dry, clean and able to carry a load.
  • If installing over a mineral subfloor such as concrete, cement, anhydride screed or stone tile, you must first measure the humidity using a CM-device. The following values should not be exceeded by the stone floor:
  • Cement screed: With underfloor heating 1.8 per cent CM; without underfloor heating 2 per cent CM.
  • Anhydride screed: With underfloor heating 0.3 per cent; without underfloor heating 0.5 per cent CM.
  • Before installing laminate over mineral substrate, you must first lay down an appropriate vapour barrier film trough-like (“floating”) to protect against moisture. The sheeting should overlap by at least 20cm and seams should be secured with masking tape.
  • A carpeted floor is not an appropriate subfloor; all carpet must be removed thoroughly before installation. Laminate floor should be laid trough-like; the laminate may not be affixed to the subfloor.
  • For floors without footfall sound insulation we advise that you do install a sound insulation such as a 2mm thick PE film underlay or another suitable underlay that is a maximum of 3mm thick.
  • Lay rows in the same direction as the laminate panels.
  • Opened cartons should be installed immediately.

Krono Installation Guides

Easy installation with the 1clic2go System

Below you will find a description of how to install laminate flooring using the 1clic2go System.

Download installation guide

  1. Lay the first panel with the short tongue side against the wall.
  2. Click the next panel tongue side into the first panel.
  3. Continue clicking in additional panels until the end of the row.
  4. Lay the second row of panels lengthwise and click into the groove side of the first row.
  5. Attach additional panels as in [2] and click in.

Laminate Installation: Twin Clic System

Easy installation with the Twin Clic System

Below you will find a detailed description of how to install laminate flooring using the Twin Clic System.

Download installation guide pdf

Begin installing in the left-hand corner of the room. Lay the first panel with the tongue side (short side) parallel to the wall and secure the expansion gap with wall spacers. Insert a second plank tongue-side at a 30-degree angle in the groove side of the previously laid first panel and then press into the floor. Pay attention that the long edges are in alignment, do not offset them and be sure they form a straight line. This is necessary to be able to install the second row of panels seamlessly by inserting them lengthwise into the first row.

Should the gap on an uneven wall be too large or too small in certain places, please transfer the wall progression to the first row of panels and saw the panels accordingly. Add further panels until the end of the 1st row.

Turn the last plank in the row 180° to fit/cut to size, with the decorative side right-side up next to the previously installed row (groove side to groove side) and place against the wall. On the tongue side, make sure there is an expansion gap of 12 - 15mm. Mark the panel length and saw. To avoid edge splitting the decorative side should be turned downwards when using an electric jigsaw or circular hand saw. Otherwise, saw the panel right side up. Each new row should start with the leftover panel piece (at least 20 cm long) from the previous row. The second row should begin with a half-panel or the remaining panel from the 1st row. Please make note that the panel should not be shorter than 30cm and no longer than 95cm. The joint offsets (transverse joint offsets) from row to row must be at least 30cm each.

The first panel piece in the 2nd row should be placed so that the lengths of the panels in the 1st and 2nd rows lie parallel on top of each other but are not clicked in. This means the tongue side of the 2nd row should lie on the groove side of the 1st row. Before clicking in additional panels, put the entire row of panels for the 2nd row in place. To do this, follow the same instructions as for the 1st row. Once the entire 2nd row is laid down next to the 1st row, these will be raised approx. 2 cm lengthwise on the left side of the panel facing the room (tongue side).

The tongues of the panels in the 2nd row (raised area) slide into grooves of the 1st row. When pressed in, the panels will make an audible clicking sound. Repeat this process along the length of the entire 2nd row (“zip” method) until the 1st and 2nd rows are laid together seamlessly and with no height offset. When connecting the 1st and 2nd rows, make absolutely sure that the panels are laid lengthwise with no joint offset (perfectly aligned). Continue laying further rows as directed for the 2nd row, while also keeping in mind that the joint offsets must be at least 30 cm.

For installation areas of more than 8 metres in length or width, movement profiles (at least 2 centimetres wide) are required as a joint. This should likewise be done for a flooring installation continuing across more than one room, e.g. door thresholds. For fitting under doorframes, the area in the doorway must be broken up. For this, use the profiles from our range. These expansion joints can be expertly covered with the proper joint profiles.

Tip: Lay the panels with the long end in the direction of the main source of light!

Should the laminate floor be glued or bonded with a joint sealant, there must be enough Type D3 PVA glue or Clickguard™ applied to the top tongue side of each panel (1 x long side 1 x short side). After approx. 10 minutes the touch dry leftover glue should be removed with a plastic scraper. The rest can be completely removed with solvent, a scratch-free pad or clear warm water.

When using Clickguard™, follow the user manual carefully. After you have completed the installation, remove the wall spacers. For heating pipes, bored holes must be left 3 centimetres larger than the pipe diameter. Saw out the “alignment piece”, glue, alight and fix with a wedge to dry. Finally, conceal cut-outs with a radiator collar. Cut wooden door frames so that a panel with sound insulation including a 2-3mm gap fits underneath.

For the perfect finish, affix skirting board mounting brackets with 40-50cm spacings to the wall and mount the cut-to-size skirting boards to the wall.